The Osogbo‑Akoda‑Gbangan road project and the Osogbo‑Iwo‑Ibadan road reconstruction have officially been flagged off by the Federal Government. These projects aim to improve transport, reduce travel time, and strengthen economic activity across Osun and Oyo states. Representing President Bola Ahmed Tinubu, Minister Adegboyega Oyetola described the roads as vital to the Renewed Hope Agenda’s road improvement plan.
Osogbo‑Akoda‑Gbangan Road Project Overview
The Osogbo‑Akoda‑Gbangan road project spans 44 kilometers in each direction, totaling 88 kilometers. It runs from Old Garage Roundabout in Osogbo through Owode Ede, Akoda Ede, Sekona, Oogi, and Odeomu, before terminating at Gbongan on the Ife‑Ibadan Expressway. Moreover, the project will use rigid pavement technology to ensure durability. In addition, sections already dualized will be rebuilt because of their poor condition.
Osogbo‑Iwo‑Ibadan Road Project Reconstruction
The Osogbo‑Iwo‑Ibadan road project covers about 82 kilometers. It begins at Dele Yes‑Sir Roundabout in Osogbo and passes through Ara, Awo, Ede, Telemu, Iwo, and Laagun before reaching Ibadan. This route is critical for moving agricultural produce and goods between Osun and Oyo states. The Federal Government awarded the contract to Peculiar Concerns Limited for ₦114.85 billion, with a completion timeline of 24 months.
Funding for Osogbo‑Akoda‑Gbangan Road Project
The government awarded the Osogbo‑Akoda‑Gbangan road project to Trucrete Solutions Limited for ₦101.81 billion. Both contracts have a 24‑month completion period. Therefore, the projects are expected to deliver results within two years, provided contractors meet quality standards and timelines.
Technical Features of Osogbo‑Akoda‑Gbangan Road Project
Construction will involve:
- Site clearance and removal of unsuitable materials.
- Milling of existing asphalt pavement.
- A 100 mm wet-crushed stone base.
- A 200mm cement‑stabilized base course.
- A 200mm continuously reinforced concrete pavement.
In addition, supporting infrastructure will include solar‑powered street lighting, drainage systems, landscaping, lay‑bys, and CCTV cameras for security.
Economic Benefits of Osogbo‑Iwo‑Ibadan Road Project
Minister of Works David Umahi explained that the projects will:
- Reduce travel time and vehicle maintenance costs.
- Support the movement of agricultural produce.
- Connect communities with economic advantages.
- Encourage trade, employment, and national development.
Consequently, the roads are expected to boost regional commerce and logistics while improving security operations.
Community Support for Osogbo Road Projects
The Federal Government appealed to host communities, traditional rulers, and stakeholders to cooperate with contractors. This cooperation will ensure smooth execution and timely delivery. Contractors assured compliance with quality standards, timelines, and value‑for‑money expectations.
Conclusion
The Osogbo‑Akoda‑Gbangan road project and the Osogbo‑Iwo‑Ibadan road reconstruction represent a major step in Nigeria’s infrastructure renewal. By investing in durable rigid pavement technology and modern supporting infrastructure, the Federal Government aims to improve connectivity, reduce costs, and stimulate economic growth across Osun and Oyo states.
These projects are not just about roads; they are about linking communities, boosting trade, and delivering on the promise of the Renewed Hope Agenda.


